Technical reliability
Plumbing, waterproofing, and ventilation handled with disciplined standards.
Bathroom Renovation • Montreal
Complete bathroom renovations in Montreal: plumbing, waterproofing and finishing handled in-house. Browse real visuals and request your free estimate.


RBQ Licensed

Fully Insured

Free Estimate

Montreal-Based

Plumbing, waterproofing, and ventilation handled with disciplined standards.
Clear work phases to reduce bathroom downtime as much as possible.
Moisture-ready materials and careful installation details.
A simple, well-structured path from first visit to finishing details, so your bathroom renovation stays stress-free.

Step 1
We reply the same business day and schedule a visit, Monday to Friday. We take measurements, check plumbing and ventilation, and look for signs of moisture behind the existing surfaces; what is hidden inside the walls is what derails a bathroom budget.
Step 2
Finishes, shower or tub, storage, and fixtures, with the budget impact of each option made clear. After a technical assessment we tell you plainly what can be kept and what has to be replaced.
Step 3
Controlled demolition, then plumbing and waterproofing handled before any finish goes on: the invisible work that decides whether the bathroom still holds up in ten years. Tile, fixtures, and finishes follow in sequence.
Step 4
We check water points, seals, and finishes with you, note a punch list where needed, clean up fully, and hand the space back.
A standard bathroom is renovated in 2 to 3 weeks. That assumes decisions are made ahead of time and no hidden structural issues. Here is what actually happens.
Week 1
The most technical week, and the one that decides how long your bathroom lasts.
Week 2
The space transforms: surfaces and fixtures go in, then get adjusted.
Week 3 (if needed)
Reserved for larger projects or for what demolition uncovers. It is not automatic.
Compare layout, storage, fixture, and finish options through real project visuals.

See side-by-side changes in comfort, function, and finishing quality.








I absolutely love my new bathroom. It's a 1950 building, and the bathroom had last been badly renovated in the early 1990's. Semih and crew made it into exactly what I wanted. They did encounter unforeseeable issues along the way, so it took longer than expected, but they dealt with everything very professionally. I was cheered that although it was not to their taste, they didn't question my design choices. Wish I'd known these guys when I was doing my kitchen!
Quick structure to compare scope and quality level before requesting your estimate.
Free estimate · Average value of $250
Average value of $250, which varies with the location and type of project.

Share your key project info and we will get back to you quickly with practical next steps.
Generally 2 to 3 weeks, unless an unexpected structural issue arises. A detailed schedule with a start and end date is confirmed before demolition begins.
Yes. These are planned as core technical priorities for long-term reliability.
Yes, after technical review. We clearly identify what can be reused safely.
Yes. The initial estimate request is free and without obligation.
You can also explore our full services for kitchens, basements, structural work, and post-disaster response.
FREE ESTIMATION
Reach out today to get your free, clear project estimation.
Get Your Free Estimation