Bathroom Renovation • Montreal

Montreal Bathroom Renovation - 2 to 3 Weeks, No Surprises

Complete bathroom renovations in Montreal: plumbing, waterproofing and finishing handled in-house. Browse real visuals and request your free estimate.

ConsQualif bathroom renovation
  • RBQ Licensed

    RBQ Licensed

  • Fully Insured

    Fully Insured

  • Free Estimate

    Free Estimate

  • Montreal-Based

    Montreal-Based

What gives clients confidence

Bathroom renovated by ConsQualif

Technical reliability

Plumbing, waterproofing, and ventilation handled with disciplined standards.

Controlled timeline

Clear work phases to reduce bathroom downtime as much as possible.

Long-lasting finish

Moisture-ready materials and careful installation details.

How your bathroom project runs

A simple, well-structured path from first visit to finishing details, so your bathroom renovation stays stress-free.

Bathroom renovation work in progress

Step 1

Initial assessment

We reply the same business day and schedule a visit, Monday to Friday. We take measurements, check plumbing and ventilation, and look for signs of moisture behind the existing surfaces; what is hidden inside the walls is what derails a bathroom budget.

  • CostFree, no obligation
  • You receiveA detailed written estimate, prepared within 3 to 10 business days depending on project complexity.

Step 2

Plan and selections

Finishes, shower or tub, storage, and fixtures, with the budget impact of each option made clear. After a technical assessment we tell you plainly what can be kept and what has to be replaced.

  • You receiveA detailed schedule and a signed-off selection list, before work begins.

Step 3

Build and install

Controlled demolition, then plumbing and waterproofing handled before any finish goes on: the invisible work that decides whether the bathroom still holds up in ten years. Tile, fixtures, and finishes follow in sequence.

  • DurationTypically 2 to 3 weeks, barring structural surprises
  • You receiveA progress update at every key milestone on site.

Step 4

Final inspection

We check water points, seals, and finishes with you, note a punch list where needed, clean up fully, and hand the space back.

  • You receiveA bathroom ready to use, cleaned and checked point by point.

Your timeline, week by week

A standard bathroom is renovated in 2 to 3 weeks. That assumes decisions are made ahead of time and no hidden structural issues. Here is what actually happens.

  1. Week 1

    Demolition, plumbing and waterproofing

    The most technical week, and the one that decides how long your bathroom lasts.

    • Demolition and debris removal
    • Plumbing and electrical adjustments
    • Waterproofing membrane and surface prep
  2. Week 2

    Tile, fixtures and finishing

    The space transforms: surfaces and fixtures go in, then get adjusted.

    • Tile work and shower or bathtub installation
    • Vanity, faucets and lighting
    • Caulking, touch-ups and final inspection
  3. Week 3 (if needed)

    Margin for surprises

    Reserved for larger projects or for what demolition uncovers. It is not automatic.

    • Fixing a structural issue or hidden water damage
    • Extra drying time between certain stages
    • Waiting on a special-order material or fixture

What can stretch the schedule

  • A structural issue or hidden water damage found during demolition
  • Lead time on a specific tile or fixture
  • Scope changes mid-project
  • Drying time between certain stages

Bathroom project inspiration

Compare layout, storage, fixture, and finish options through real project visuals.

Renovated bathroom with custom storage

Bathroom Before / After

See side-by-side changes in comfort, function, and finishing quality.

Bathroom 1 - Before
Bathroom 1 - After
BeforeAfter
Bathroom 2 - Before
Bathroom 2 - After
BeforeAfter
Bathroom 3 - Before
Bathroom 3 - After
BeforeAfter

Bathroom client feedback

4.7/5Google Reviews
Renovated shower with white subway tile and black accentsJaneshead's renovated bathroom with a pink wall and personalized finishes
I absolutely love my new bathroom. It's a 1950 building, and the bathroom had last been badly renovated in the early 1990's. Semih and crew made it into exactly what I wanted. They did encounter unforeseeable issues along the way, so it took longer than expected, but they dealt with everything very professionally. I was cheered that although it was not to their taste, they didn't question my design choices. Wish I'd known these guys when I was doing my kitchen!
Janeshead

Bathroom remodeling • Montreal

Price assessment
Reasonable price
Services
Bathroom remodeling

Package comparison

Quick structure to compare scope and quality level before requesting your estimate.

  • Essential

    Project scope
    Update
    Shower / bath
    Keep existing
    Storage
    Simple optimization
    Finish level
    Reliable
  • Comfort

    Project scope
    Partial renovation
    Shower / bath
    Standard replacement
    Storage
    Improved cabinetry
    Finish level
    Upgraded
  • Premium

    Project scope
    Full remodel
    Shower / bath
    Custom solution
    Storage
    Custom cabinetry
    Finish level
    High-end

Free estimate · Average value of $250

Your detailed estimate is on us

  • A reply the same business day
  • An on-site visit, Monday to Friday
  • A detailed written estimate within 3 to 10 business days
  • No obligation

Average value of $250, which varies with the location and type of project.

ConsQualif

Get your free estimate

Share your key project info and we will get back to you quickly with practical next steps.

Security check in progress…

Your information is used to process your request. Privacy policy

514-766-6800

Bathroom renovation FAQ

How long does a bathroom renovation take?

Generally 2 to 3 weeks, unless an unexpected structural issue arises. A detailed schedule with a start and end date is confirmed before demolition begins.

Do you handle plumbing and waterproofing?

Yes. These are planned as core technical priorities for long-term reliability.

Can some existing elements be kept?

Yes, after technical review. We clearly identify what can be reused safely.

Is the estimate free?

Yes. The initial estimate request is free and without obligation.

Planning other upgrades too?

You can also explore our full services for kitchens, basements, structural work, and post-disaster response.

FREE ESTIMATION

Let's discuss your project

Reach out today to get your free, clear project estimation.

Get Your Free Estimation